Over 50 years proof of excellence in concrete repair

Jet Set

Instructions

 

Easy Application Instructions

For all products:

  • Make certain all surfaces to be repaired are clean - free from grease, dirt, oil film, release agents and marine growth. Clean, chip or wire brush all surfaces down to fresh concrete. Remove all loose material.

  • Add water to mix only. Do not add mix to water.

  • Just before application, be certain all surfaces to be repaired are wet (except Jet Set Smooth).

  • After final set, (about 10 minutes) use curing agent, or keep repair wet, especially in hot or dry weather.

  • Clean mixing equipment after each batch. It can re-temper the next batch, or harden on.

Important:

  • Do Not apply to dry surfaces (except Jet Set Smooth).

  • Do Not apply to dirty, slimy or oily surfaces.

  • Do Not overwork repairs.

  • Do Not Re-mix.

  • Do not brush with water until after final set (about 10 minutes).

  • Do Not add mix to water (except Jet Pour).

  • Do Not use bonding agents.


JET SET Complete Repair:

  1. Mix to a no slump consistency. Do not add too much water. Mix should mound up with no slump.

  2. Thoroughly wet the surface that is to be repaired, then place mix firmly to existing concrete, wood or steel. May be applied underwater (allow mixture to begin firming before underwater application).

  3. Mix the material for no more than 1 or 2 minutes before application.

  4. Mix only enough material so that it can be used in 4 or 5 minutes. Allow repair to become firm to the touch - 6 to 10 minutes - then shave to grade with trowel edge. Finish repair in usual way.

  5. Do not overwork. Do not brush with water until final set (about 10+ minutes).

JET PLUG:

  1. Mix to a no-slump consistency. Add only enough water to gain a consistency of heavy glazing putty.

  2. Do not mix the material for more than 1 minute after adding water. It is very fast setting.

  3. Mix only enough material so that it can be used in 1 or 2 minutes.

  4. Seal adjacent areas, chip a V-shaped void in pressure seepage areas, or chip and clean the hole or opening to be plugged. Wet the surface. Form a plug slightly larger than crack, hole or opening, hold in hand until firming starts, 1 minute or so, then force plug into void solidly and hold until firm, 1 or 2 minutes.

  5. After plug becomes firm, shave to grade with trowel edge.

  6. For normal sealing, Jet Plug can be troweled into place. Do not overwork.

  7. For patching, follow the same mixing directions. Apply like Jet Set Complete Repair, but shave and finish after about 2-3 minutes.

JET POUR:

  1. Mix clean water with dry material to attain a consistency of heavy syrup.

  2. When mixing to place vertically, add less water for a putty like consistency. After attaining proper consistency, mix for 1 or 2 minutes.

  3. If JET POUR mixture becomes too watery, additional powder may be added in the first few minutes.

  4. Mix only enough material so that it can be used in 8 or 10 minutes.

  5. Remove puddled or excess water from hole or void.

  6. Pour to proper level. Don’t touch for several minutes until repair begins to harden. Shave and finish.

JET SET SMOOTH:

  1. Make sure surface is clean and contaminant free. Power wash if necessary.

  2. Add enough clean water to mix to attain a soft putty consistency – comfortable for troweling.

  3. Mix enough material in a batch so that it can be used in approximately 15 minutes.

  4. Trowel the material onto wall. Work it firmly into fissures, holes and cracks. Be sure it completely fills these voids.

  5. Trowel to desired thickness. It can be feathered to micro-thin.

  6. No grinding is necessary, as the edge will be virtually undetectable.

  7. Allow at least 24 hours before painting. Jet Set Smooth is very low alkalinity, so accepts paint well.

  8. Bonding agents can be used if desired.

JET SET – WILSON LATEX:

  1. Make certain that the surface to be repaired is free from grease, dirt, oil film, curing compounds, marine growth, dust, and loose particles.

  2. Mix cool clean water with dry material to attain a heavy putty consistency.

  3. Mix only enough material so that it can be used in 8 or 10 minutes.

  4. Allow at least 12 hours (preferably 24 hours) prior to installation of floor covering.

  5. For patching, firmly place patch, allow it to take initial set, then shave to grade and finish.

  6. For coating, mix to slurry consistency and trowel into place, any thickness to feather edge.